How to lay tiles for floors and walls in buildings?

How to lay tiles for floors and walls in buildings?

Tile is a very popular material for floors and walls in buildings. If you are planning to lay tiles in a house or apartment. It is important to know some steps and tips that will help you do it correctly and professionally. Let’s consider the main steps of the tiling process.

Surface preparation

Before starting to lay tiles, it is necessary to prepare the surface on which the tiles will be glued. The surface must be flat, clean and dry. If there is an old tile on the surface, it must be removed and the place where the new tile will be glued must be cleaned.

Measurement and marking

The next step is to measure and mark the place where the tiles will be glued. It is necessary to determine the angle and starting point from which the laying of tiles will begin. You also need to measure the dimensions of the tiles and determine what the gap between them will be.

Preparation of glue

When laying tiles, you need to use a special glue. Before starting to lay tiles, it is necessary to prepare the glue according to the instructions on the package. The glue should have a uniform consistency and not contain lumps.

Laying tiles

After preparing the surface and glue, you can start laying tiles. Start from the starting point and place the tile on the adhesive, pressing it onto the surface. Then place the next tile in place, leaving a gap between them.

After laying the tiles, several important steps must be taken to ensure the reliability and durability of the coating.

Drying glue

After laying the tiles, the glue must be allowed to dry. The drying time depends on the type of glue, the thickness of the layer and the temperature and humidity of the air. Usually, the drying time is from 24 to 48 hours.

Grouting gaps

After the glue dries, it is necessary to fill the gaps between the tiles with a special grout. The grout ensures a reliable connection between the tiles and prevents the ingress of dirt and water.